Demolition

Demolition โ€” CNB Renovation Toronto
Pre-construction site prep ยท Aurora

Interior strip-out, residential teardown, pre-1980 asbestos abatement, permit handling, and waste-disposal manifest โ€” done as a regulated process, not a sledgehammer party.

137 projects ยท permit-handled
10+ years in GTA
HomeStars Best
BILD GTA RenoMark
WSIB Insured
License #TBD

What CNB demolition covers

  • Selective interior demo โ€” walls, ceilings, kitchens, bathrooms, flooring โ€” preserving electrical, plumbing, structural items you specify.
  • Full residential teardown โ€” for pre-construction lot prep, with City of Toronto permit and utility disconnection coordination.
  • Asbestos and lead paint testing on any home built before 1990 โ€” mandatory in Ontario, included in scope.
  • Designated substance abatement โ€” when results require it, executed by Ministry of Labour certified subcontractors with air clearance testing before reopening.
  • Waste manifest + recycling โ€” drywall, metal, wood, and concrete sorted; manifest copies sent to you for insurance/legal record.

What we won’t do

Timeline expectations

Interior strip-out: 3โ€“7 days depending on scope. Full home teardown: 7โ€“14 days plus 2โ€“4 weeks for permit and utility coordination. We do not start demo until utilities are confirmed disconnected at the meter.

Pricing transparency

Toronto 2026 cost ranges

Basic finish$35-55/sqft
Mid-tier with bath$55-80/sqft
Legal second suite$90-140/sqft
+ Separate entrance+$10-30K

Real client projects, not generic estimates. Quotes always written, no surprise fees.

How it works

From first call to handover

01

Free walkthrough

We come to your home. No quote on the spot โ€” proper assessment first.

02

Design + permit

Drawings, code review (OBC 2024), permit filed with City of Toronto.

03

Build

Site crew, weekly milestones, photo updates, no subcontractor surprises.

04

Handover

Inspection, walkthrough, warranty documents, tenant marketing tips.

Common questions

FAQ

Do you handle permits?

Yes. We file with the City of Toronto, schedule inspections, provide all documentation for closing or insurance. Permits typically take 6-12 weeks to issue in Toronto 2026.

What if my basement has a low ceiling?

Toronto Bylaw 569-2013 + OBC 2024 require 1.95m minimum (1.9m under beams) for habitable basement. Below that โ€” we recommend underpinning (+$30-80K) or bench footing.

How long is the typical project?

Basement: 8-12 weeks build. Bathroom: 2-4 weeks. Decking: 1-2 weeks. Demolition: 1-3 weeks. Permit timeline adds 6-12 weeks before build can start.

Are you insured?

Yes. WSIB clearance, $2M liability coverage, licensed Toronto contractor. 10-year structural warranty on all basements.

Get a free walkthrough quote

437-217-5519 ยท cnbrenovation@gmail.com ยท 8 AM - 11 PM, 7 days a week

Schedule walkthrough โ†’