Bathroom Renovation · · 2 min read

Bathroom Renovation Cost Toronto 2026: What to Expect

Bathroom Renovation Cost Toronto 2026: What to Expect
Click to enlarge

A bathroom renovation in Toronto in 2026 costs $8,000–70,000+ depending on size and scope. A basic 3-piece powder room refresh runs $8,000–15,000. A full spa ensuite with heated floors and curbless shower runs $40,000–70,000. Here’s what you’re actually paying for.

Toronto bathroom renovation cost ranges by scope

Scope Cost range
Cosmetic refresh (tile, vanity, fixtures only) $8,000–15,000
Full 3-piece gut and rebuild (no layout change) $18,000–28,000
Full gut with layout change + new plumbing rough-in $28,000–45,000
Spa primary ensuite (freestanding tub, curbless shower) $45,000–70,000
Basement 3-piece addition (new rough-in, ejector pump) $12,000–22,000

Where the money goes: real 5-piece ensuite breakdown

  • Demo + disposal: $1,800
  • Waterproofing (Schluter Kerdi or Laticrete): $2,400
  • Plumbing (freestanding tub, dual shower, double vanity): $8,500
  • Electrical (heated floor, exhaust, pot lights, GFCI): $3,200
  • Tile (floor + walls, 12×24 porcelain, feature wall): $6,800
  • Freestanding tub (Kohler or equivalent): $3,200
  • Curbless shower (frameless glass, niche, rain head): $5,400
  • Double vanity (floating, 72″, quartz top): $4,100
  • Heated floor mat + thermostat: $1,600
  • Accessories, mirrors, pot lights, trim: $2,200
  • Total: $39,200

What inflates bathroom renovation costs in Toronto

Mold behind tile. The most common hidden cost — discovered only on demo day. Full remediation: $1,500–4,000. Moving plumbing. Relocating the toilet or tub rough-in by even 12 inches can add $2,000–4,000. Floor sistering. Wet bathrooms often have compromised subfloor — sistering joists adds $800–2,000. Knob and tube. Any electrical work in homes built before 1985 may require replacing old wiring, adding $2,000–5,000.

Do you need a permit for a bathroom renovation?

Cosmetic work (tile, vanity, fixtures) does not require a permit in Toronto. Adding a new bathroom, moving the plumbing rough-in, or adding a bathroom where none existed — these all require plumbing permits. CNB pulls permits as required on every project.

Timeline: what to expect

A standard 3-piece gut and rebuild with no structural changes: 2–3 weeks once materials are on site. A full spa ensuite with custom tile and special-order fixtures: 4–6 weeks. Material lead times can add 2–4 weeks for custom orders — we discuss this before signing.

CNB’s approach: design-to-install

CNB provides a 3D floor plan, tile layout, and fixture selection guide before you commit. We source at trade pricing from Kohler, Grohe, and local tile suppliers — you avoid big-box markups. One project manager, one crew, no sub-trade surprises. Free walkthrough — call (437) 217-5519.

Ready to start your renovation?

Free on-site walkthrough — no obligation

We come to your home, assess the space, and send a written quote within 24 hours. Serving Toronto, Mississauga, Brampton and all GTA.

Request free estimate → (437) 217-5519
215+Projects done
10+Years in GTA